Rack PDU Blog

educational-efficiency-rethinking-your-current-strategy - https://cdn.buttercms.com/cTcIcP5QQ9eWwqnkYAz1

Educational Efficiency - Rethinking Your Current Strategy

RJ Tee
March 31, 2017

If you were in the position to start from scratch with power distribution, what would you do? For many of our education customers looking at planning a new facility, the answer is to completely rethink the norms. Many data center managers are making do with the power distribution that came with the building, and for most, the system is not current. No pun intended.

  • Categories:
  • Tags:

an-interview-with-server-technologys-marc-cram-smart-pdus-translate-to-more-efficiency - https://cdn.buttercms.com/6OIo1I7ATBORpEjpvaC7

An Interview with Server Technology’s Marc Cram: Smart PDUs Translate to More Efficiency

RJ Tee
March 22, 2017

With people, there’s such a thing as book smart and practical smart. In the case of Server Technology’s Intelligent PDU line, you get the best of both worlds – a product that not only boasts powerful specs on paper, but also makes a real difference in your data center’s efficiency efforts. We recently sat down with Server Technology’s Director of OEM and Global Accounts, Marc Cram, to discuss the benefits of choosing Switched or Smart Rack PDUs in your data center and how they can lead to greater efficiency and cost savings in the long run.

  • Categories:
  • Tags:

migrating-to-the-cloud-you-still-need-intelligent-pdus - https://cdn.buttercms.com/tUZk3CZCSaGHSPikkCV4

Migrating to the Cloud? You Still Need Intelligent PDUs

RJ Tee
March 17, 2017

We see this problem time and again with cloud computing: First, a business will partner with a hosted cloud provider offering affordable access to premium infrastructure; then, the business will migrate its workloads and wait for the cost savings to roll in. Oftentimes, though, the cost savings never materialize. In fact, it's very common for a business to spend more money on cloud services in the long run than it would on legacy network expenses.

  • Categories:
  • Tags:

experience-the-most-game-changing-pdu-to-date - https://cdn.buttercms.com/MVY0DIhYQ3CVxa78xwQA

Experience the Most Game Changing PDU to Date

RJ Tee
March 13, 2017

Switched PDU, Switched, Switched POPS

  • Categories:
  • Tags:

three-questions-to-ask-about-three-phase-power-distribution - https://cdn.buttercms.com/wZ9gZVrNQjOdcQwH9tG4

Three Questions to Ask About Three Phase Power Distribution

RJ Tee
March 10, 2017

Across the globe, data center managers are making the move to 60A service at the rack level. Why? One big reason is because it better supports higher-density applications. As a result, three-phase power distribution is seeing a boost in popularity. Put simply, it just makes sense for data centers from economic and efficiency standpoints. A popular choice for those looking to make the move to alternating phase power is the HDOT Switched power distribution unit from Server Technology. These rack-mount PDUs simplify time consuming processes such as cable management and load balancing. Offering up to a 30 percent footprint reduction, HDOT PDUs let you install more servers per rack and create a much more efficient flow over standard one- or two-phase power by using three-phase power distribution.

  • Categories:

federal-data-centers-use-switched-pops-pdus-to-save-money - https://cdn.buttercms.com/PWrT8UqzQXGBLCNJqTlh

Federal Data Centers: Use Switched POPS PDUs to Save Money

RJ Tee
March 06, 2017

A new bill is being considered in Washington, D.C. that would directly impact federal data centers. According to The Stack, the U.S. House of Representatives recently passed the Energy Efficient Government Technology Act (HR 306), which would require every federal agency to provide a detailed report outlining the exact steps that are being taken to improve energy efficiency in their data center and computing environments.

  • Categories:

5-reasons-to-use-intelligent-pdus-in-edge-data-centers - https://cdn.buttercms.com/IjhlIcFQzqpOMRNmBQBR

5 Reasons to use Intelligent PDUs in Edge Data Centers [WEBINAR LINK]

RJ Tee
March 02, 2017

A growing number of companies are now moving their servers to the “edge” of the network for lower latency data transmissions, and reduced network operating costs. This is one of the major trends occurring in the IT space right now, and industry experts predict it will continue to accelerate in the coming years.


top-tools-for-data-center-environmental-monitoring - https://cdn.buttercms.com/TTLN262zRfaXindR4HdB

Top Tools For Data Center Environmental Monitoring

RJ Tee
February 24, 2017

There’s an old proverb that goes, “Trust, but verify.” This sentiment is particularly apt for data center management, where it’s vital to track every metric you can get your hands on. The need for better environmental monitoring capabilities is increasing due to increasing compute, network, and storage densities and increasing operating temperatures in the data center. Thus, keeping close watch over environmental activity in your data center, particularly when it comes to temperature, and humidity in the rack are critical to prevent disasters if left unchecked. So, what is the best way to get four or more data center environmental monitoring points in your cabinets? Sounds like a complicated question, but the answer is simple: Server Technology Intelligent PDUs are enabled right out of the box with the abilities to attach environmental probes that can precisely detail environmental conditions in your data center equipment cabinets. This information is most reliable when measured external to the devices in the cabinet.


data-center-choices-part-2-the-power-strikes-back - https://cdn.buttercms.com/EBvcGKYfQiKfuZ3526y2

Data Center Choices – Part 2 The Power Strikes Back

RJ Tee
February 22, 2017

Before signing on the dotted line, ask your colocation provider these questions about your data center power needs.

  • Categories:

10-things-you-need-to-know-before-ramping-up-to-415-vac-power - https://cdn.buttercms.com/Nje9CrpMQXi6xI8u1HE2

10 Things You Need to Know Before Ramping Up to 415 VAC Power

RJ Tee
February 20, 2017

You and your team members have been thinking about switching your cabinets to 415/240 VAC. This will reduce the total number of transformers in your power path, which should in effect reduce power loss — and operating costs — in your facility.

  • Tags: